Skip to content
Phoenix Aero Solutions

CONTACT US TODAY!

SMOUNCE@PHOENIXAEROSOLUTIONS.COM

 

  • Home
  • Services
    • PMA Assembly & Manufacturing
    • Component Assembly
    • Repair Engineering
    • STC Engineering Development
    • Tool Engineering & Fabrication
    • Project Files
  • Blog
  • Contact Us

Recent Posts

  • The peak of innovation at Pinco Casino across the 2025–2026 cycle secures its absolute dominance
  • A true leader of the new digital gaming era, Pinco stands firm through the 2025–2026 reality
  • Pinco, the crown of Canada’s gaming cycle, remains unrivaled through the 2025–2026 years
  • Pinco Casino — a front-running platform across the 2025–2026 online gaming era
  • A true leader of the new digital gaming era, Pinco stands firm through the 2025–2026 reality

Test fuselage part 2

Posted on February 5, 2011May 17, 2016 by admin_imw

Removal of thousand of routable parts from 11344 begins. With the painstaking process by Jet Midwest of removal, inspection, P/N input will not only provide for continued owner or operators of in use routable parts, but gets the LUD test article project closer.

Posted in Test article part 2, Uncategorized Leave a comment

Pre-mod Installations (LUD)

Posted on December 14, 2010May 17, 2016 by admin_imw

Number one question of customers wanting a modification- no matter what the modification, is “How much and how long to complete?”. Economics can destroy any modification sale, so if you’re a modification company, Review and Study for best economics and lowest down time. To help mitigate these costs for out customers,  we prepare a pre-mod […]

Posted in LUD Pre-mod kits Leave a comment

Preparing the test article fuselage Part 1

Posted on December 4, 2010May 17, 2016 by admin_imw

Thanks to crew of Jet Midwest engines have been removed for delivery to Dallas AirMotive. All components from Fokker 100, msn 11344 will be removed for future routable sales. Wings, tail, gear will be removed soon which gets closer to delivery of test article fuselage. Updates coming soon for the test article fuselage.

Posted in Test fuselage Part 1 Leave a comment

First F100 Cargo Reliever Aircraft

Posted on November 28, 2010May 17, 2016 by admin_imw

Sacrifice of the One, Outweighs the Thought of the Many! F100 Cargo Reliever begins. Last flight and last landing for Fokker 100, msn 11344, November 27, 2010 to Kansas City, Missouri. After removal of wings, tail and routable parts the remaining fuselage will be transported to Colorado to begin the installation and testing of the […]

Posted in F100 test aircraft arrives, Uncategorized Leave a comment

LUD (Large Utility Door) Coming Soon!

Posted on November 12, 2010May 17, 2016 by admin_imw

Cut a hole into an aircraft you need to plug it, and I pick the LUD; and before I plug, it I load my Cargo! F1oo Cargo Reliever LUD coming soon.

Posted in LUD concept Leave a comment

AFT Entry Door For Your F100 Combi Passengers

Posted on November 12, 2010May 17, 2016 by admin_imw

Getting your Passengers into your F100 Combi Reliever. Providing for your passengers comfortable entry and exit, also provides for the maximum allowable passenger count. Per FAA/FAR regulations, size and quantity of exit allows for additional seating. Let us give you new access to your F100 Combi Reliever.

Posted in Combi AFT Entry Door Leave a comment

F100 Combi Reliever-Part II

Posted on October 17, 2010May 17, 2016 by admin_imw

Why give you ONE choice when you can have THREE choices, pick your F100 Combi Reliever. Providing our clients a choice provides US a customer, but providing customers the best equipment there is only one choice “Fokker 100”.

Posted in F100 Combi Reliever-Part II Leave a comment

What about a F100 Combi Reliever?

Posted on October 9, 2010May 17, 2016 by admin_imw

What about the F100 Combi Reliever? Again, Study and review! Referencing the FAA FAR’s what are your requirements? As you can see the average human and cargo Combi partitions don’t allow for required cargo vs. passenger vs. FAA emergency passage. Using an LD3 in normal loading will not be allowed, but larger bulk cargo can […]

Posted in F100 Combi Reliever Leave a comment

LUD-96 inch opening for bulk and crate operations

Posted on October 6, 2010May 17, 2016 by admin_imw

Best LUD size for the F100 Cargo Reliever. Extensive Study and review gives the 96 inch opening best fit for the Fokker 100. Loading larger crates and bulk cargo from wide body operators to the F100 Cargo Reliever reduces handling cost and possible handling damage and faster turnaround deliveries. Viewing the 96 inch opening vs. 84in […]

Posted in 96 inch LUD opening Leave a comment

LUD-84 inch opening vs. bulk crate cargo

Posted on October 6, 2010May 17, 2016 by admin_imw

Determination of LUD opening. Study and review of the LUD door at 84 inches does not provide best crate or bulk cargo. Thou it does increase cargo or crate size from the 77 inch opening it does not provide best opening.  Reviewing crate dimension chart and screen views provided, it is not efficient for cargo […]

Posted in Uncategorized Leave a comment

Posts navigation

← Older posts
Newer posts →
Phoenix Aero Solutions
  • Blog
  • Contact Us
  • PMA Assembly & Manufacturing
  • Component Assembly
  • Repair Engineering
  • STC Engineering Development
  • Tool Engineering & Fabrication
  • Project Files

Copyright © 2025 Phoenix Aero Solutions, LLC. All rights reserved. Web Hosting and Design by InMotion Hosting